Documents of category Structure

Pages from strengthening gms invfw  

Study on Strengthening the Greater Mekong Subregion Program’s Institutional Framework

Political and socioeconomic conditions in the GMS subregion have changed dramatically over the last two decades.It is vital that the Program and its institutional framework are able to respond to these changes and address new challenges.

Published by: Asian Development Bank - Author: Asian Development Bank,
Published on: Nov 2016 - Uploaded on: Dec 2016
File size: 1.2 MB - Language: English
Keyword(s): Greater Mekong Subregion (GMS) , Regional cooperation and integration , economic corridors forum
Category: Structure

Details
Rural Infrastructure Preliminary FindingsTonle Sap Lowland Stabilization Project Cambodia   TA 4756 CAM  

Rural Infrastructure Preliminary FindingsTonle Sap Lowland Stabilization Project Cambodia - TA 4756-CAM

The information presented in this report is based on work undertaken during the International Rural Infrastructure Engineer's first input on the TSLSP PPTA from 28 August to 30 September 2006.

Published by: GFA Consulting Group -
Uploaded on: Feb 2009
File size: 195 KB - Language: English
Keyword(s): Economic Development
Category: Structure

Details
Rural Infrastructure Preliminary Findings  

Rural Infrastructure Preliminary Findings

The project area, which includes parts of the provinces of Kampong Chhnang, Pursat, Battambang, Banteay Meanchey, Siem Reap and Kampong Thom, covers the central lowland plains of Cambodia around Tonle Sap lake, either side of highways 5 and 6.

Published by: GFA Consulting Group -
Uploaded on: Feb 2009
File size: 195 KB - Language: English
Keyword(s): Infrastructure
Category: Structure

Details
Stung Chinit Irrigation and Rural Infrastructure Project Baseline Income SurveyPreliminary Report:  Methodology and Survey Education  

Stung Chinit Irrigation and Rural Infrastructure Project Baseline Income SurveyPreliminary Report: Methodology and Survey Education

This document provides the methodology and survey instrument for a rural income generation baselinse study.The area in which the study was conducted is one in which a $24,000,000 ADB financed irrigation project is being implemented.

Published by: CamEd -
Uploaded on: Oct 2005
File size: 1.5 MB - Language: English
Keyword(s): Agricultural Economics , Economic Development , Farming Systems , Research , Village/Community Development
Category: Structure

Details